
FNBE E - Portfolio
Final Project
This project is an individual project. From the same site that i was doing for project 2, i need to design the landscape for the house.Also, i have to imagine that i am going to present the landscape proposal to client (who is the house owner).I have to prepare all drawings needed for every development stages. The development stages shall include:
a. project description
b. conceptual diagram
c. schematic plan
d. master plan
e. cost estimation & maintenance plan 6.
All drawings need to be completed manually (hand drawn & hand written) by using architectural graphic communication except for images. Images can be printed out.




my presentation board




Things that i proposed in the site
In this project i understand how a landscape architect proposed their proposal and also i learned how a quantity surveyor make their Bill of Quantity and Maintainence plan too.


